Window FY2028–FY2033Scenario

CRF: Water Treatment

Water user fees · Water Fund · 20-year horizon

Every figure the reserves table quotes for this fund, derived again here line by line. The bar in a public meeting is not trust-the-software; it is check line four.

← all reserve funds · horizon 6 years10 years20 years

The answer

At today's deposit of $592,401 this fund covers every draw on the horizon. Nothing more is required.

One recurrence, applied 20 times: balance = balance × (1 + 0.0%) + deposit − draws. Deposits are today’s figure, held flat. No solver and no goal-seek — the answers below are closed-form, so the same inputs always give the same figures.

Balance, both ways

negatives are shown, never floored — a fund going under is the finding
$0$2.4M$4.7M$7.1M$9.5MAt today’s deposit · FY2028 · $761,035At today’s deposit · FY2029 · $1,170,036At today’s deposit · FY2030 · $1,709,137At today’s deposit · FY2031 · $2,301,538At today’s deposit · FY2032 · $2,846,902At today’s deposit · FY2033 · $3,267,303At today’s deposit · FY2034 · $3,730,704At today’s deposit · FY2035 · $4,245,105At today’s deposit · FY2036 · $4,795,506At today’s deposit · FY2037 · $5,029,212At today’s deposit · FY2038 · $5,496,613At today’s deposit · FY2039 · $6,089,014At today’s deposit · FY2040 · $6,214,015At today’s deposit · FY2041 · $6,428,416At today’s deposit · FY2042 · $7,020,817At today’s deposit · FY2043 · $7,613,218At today’s deposit · FY2044 · $8,205,619At today’s deposit · FY2045 · $8,798,020At today’s deposit · FY2046 · $8,874,421At today’s deposit · FY2047 · $9,466,822With the gradual step-up · FY2028 · $761,035With the gradual step-up · FY2029 · $1,170,036With the gradual step-up · FY2030 · $1,709,137With the gradual step-up · FY2031 · $2,301,538With the gradual step-up · FY2032 · $2,846,902With the gradual step-up · FY2033 · $3,267,303With the gradual step-up · FY2034 · $3,730,704With the gradual step-up · FY2035 · $4,245,105With the gradual step-up · FY2036 · $4,795,506With the gradual step-up · FY2037 · $5,029,212With the gradual step-up · FY2038 · $5,496,613With the gradual step-up · FY2039 · $6,089,014With the gradual step-up · FY2040 · $6,214,015With the gradual step-up · FY2041 · $6,428,416With the gradual step-up · FY2042 · $7,020,817With the gradual step-up · FY2043 · $7,613,218With the gradual step-up · FY2044 · $8,205,619With the gradual step-up · FY2045 · $8,798,020With the gradual step-up · FY2046 · $8,874,421With the gradual step-up · FY2047 · $9,466,822FY28FY29FY30FY31FY32FY33FY34FY35FY36FY37FY38FY39FY40FY41FY42FY43FY44FY45FY46FY47
At today’s depositWith the gradual step-up

The roll-forward, line by line

every draw names its projects
YearDepositDrawsDrawn byBalanceStep-up depositBalance, stepped
Openingavailable, net of commitments, as of 31 Oct 2025$1,083,634$1,083,634
FY2028$592,401$915,000Solar Array WTF Phase 1 $875,000SCADA & instrumentation upgrades $40,000$761,035$592,401$761,035
FY2029$592,401$183,400Treatment modules MMM2 $110,000Ford Ranger #1 $40,000Altoz TRX 766i Tracked Zero Turn Rider $21,000+1 more$1,170,036$592,401$1,170,036
FY2030$592,401$53,300Filter Modules MM4 $53,300$1,709,137$592,401$1,709,137
FY2031$592,401$2,301,538$592,401$2,301,538
FY2032$592,401$47,037Electrical metering & Efficiency $47,037$2,846,902$592,401$2,846,902
FY2033$592,401$172,000Treatment Modules MMM1, compressor & VRD $172,000$3,267,303$592,401$3,267,303
FY2034 ·beyond the window$592,401$129,000F550 Dump Truck $129,000$3,730,704$592,401$3,730,704
FY2035 ·beyond the window$592,401$78,000Utility Engineer Vehicle $78,000$4,245,105$592,401$4,245,105
FY2036 ·beyond the window$592,401$42,000Boiler (Propane) WTF $42,000$4,795,506$592,401$4,795,506
FY2037 ·beyond the window$592,401$358,695Vactron $155,797Secondary Chlorination $125,000Manganese Monitor & Analyzier $77,898$5,029,212$592,401$5,029,212
FY2038 ·beyond the window$592,401$125,000Generator WTF $125,000$5,496,613$592,401$5,496,613
FY2039 ·beyond the window$592,401$6,089,014$592,401$6,089,014
FY2040 ·beyond the window$592,401$467,400Water Meters phase 1 $360,0001 TON Utility truck $82,400Pressure Reducing Valve 1 $25,000$6,214,015$592,401$6,214,015
FY2041 ·beyond the window$592,401$378,000Water Meters phase 2 $378,000$6,428,416$592,401$6,428,416
FY2042 ·beyond the window$592,401$7,020,817$592,401$7,020,817
FY2043 ·beyond the window$592,401$7,613,218$592,401$7,613,218
FY2044 ·beyond the window$592,401$8,205,619$592,401$8,205,619
FY2045 ·beyond the window$592,401$8,798,020$592,401$8,798,020
FY2046 ·beyond the window$592,401$516,000Raw Water Pump Station $490,000Backwash pump motors 20 Hp (5) $26,000$8,874,421$592,401$8,874,421
FY2047 ·beyond the window$592,401$9,466,822$592,401$9,466,822

What is lingering just outside the window

this is what drives the contribution
YearAssetDraw
FY2034F550 Dump Truck$129,000
FY2035Utility Engineer Vehicle$78,000
FY2036Boiler (Propane) WTF$42,000
FY2037Vactron$155,797
FY2037Secondary Chlorination$125,000
FY2037Manganese Monitor & Analyzier$77,898
FY2038Generator WTF$125,000
FY2040Water Meters phase 1$360,000
FY20401 TON Utility truck$82,400
FY2040Pressure Reducing Valve 1$25,000
FY2041Water Meters phase 2$378,000
FY2046Raw Water Pump Station$490,000
FY2046Backwash pump motors 20 Hp (5)$26,000
FY2049Pressure Reducing Valve 2$20,000
FY2053Greensboro Road Storage Tank Paint$311,300
17 assets beyond the window in total$3,001,395
A fund can look over-funded inside a six-year window and be correctly funded once the assets landing beyond it are on screen. The recommended contribution is computed on the full horizon, which is why this panel exists.