Window FY2028–FY2033Scenario

SCADA & instrumentation upgrades

WATER-001
WaterWaterWater Treatment FacilityWaterIn the planclassification proposed

Cost by year

$40,000 total
YearExpenditure typeBasisAmount
FY2028not statedno basis$40,000

Funding by source and year

more than one source per year is supported
SourceClassFY28Total
CRF: Water TreatmentSaved in advance$40,000$40,000
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life5 yrs
Condition
Last purchase2023-07-01 00:00:00
Previous investment$32,700
Next investment$40,000
Trade-in value
Replacement yearFY2028

The Town paid $32,700 last time and will pay $40,000 next — 22% more.

Classification

proposed
Importance2
Timing rationaleCondition
Project typeReplacement or maintenance

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

Upgrade of Treatment Process logic controls software integration. SCADA - Supervisory Control and Data Acquisition, controls equipment automation and filter operation. Allowing operators to adjust water quality, treatment set points and provides process trending.

A picture is recorded in the register at S:\databases\CIP database\photos\Water\SCADA.jpg — upload it on the edit page to show it here.

Who pays

CRF: Water Treatment — Water user fees, Water Fund.