Projects
29 of 166 · $2,613,927scenario: fit inside 1mEvery cut answers a different question, and the cuts are yours. The rail below is built from the dimensions this town keeps — add one and it appears here. Picking a parent includes everything beneath it. The charts obey the filter.
This selection, by year
follows the filterBorrowedSaved in advance
| ID | Project | Set of books | Department | Funding source | FY28 | FY29 | FY30 | FY31 | FY32 | FY33 | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|
| BLDG-023 | Shed # 2 relocation to DPWproposedverify | $500,000 | $500,000 | ||||||||
| BLDG-021 | Heat Pumps Policeproposedverify | $370,000 | $370,000 | ||||||||
| BLDG-004 | Solar Array PS & DPWproposed | $226,273 | $226,273 | ||||||||
| BLDG-012 | Heat pumps DPWproposedverify | $125,000 | $125,000 | ||||||||
| BLDG-020 | Howe control systemproposed | $124,000 | $124,000 | ||||||||
| BLDG-005 | Boiler & 3 FHA DPWproposed | $99,000 | $99,000 | ||||||||
| BLDG-001 | membrane roof DPW1proposed | $97,500 | $97,500 | ||||||||
| BLDG-024 | High Efficiency heat pump phase 1 THproposed | $93,500 | $93,500 | ||||||||
| BLDG-003 | Carpet Howeproposed | $92,000 | $92,000 | ||||||||
| BLDG-013 | Flooring PDproposed | $91,000 | $91,000 | ||||||||
| BLDG-009 | Backup Generator PSproposed | $75,000 | $75,000 | ||||||||
| BLDG-019 | Howe Library Air Handlersproposed | $75,000 | $75,000 | ||||||||
| BLDG-015 | Howe chimney liners/repointingproposed | $65,000 | $65,000 | ||||||||
| BLDG-027 | Low Temp Heat pump phase 2 THproposed | $65,000 | $65,000 | ||||||||
| BLDG-017 | Boiler RWBproposed | $61,900 | $61,900 | ||||||||
| BLDG-018 | Emergency Generator - RWBproposed | $60,654 | $60,654 | ||||||||
| BLDG-002 | Membrane Roof DPW2proposed | $56,500 | $56,500 | ||||||||
| BLDG-011 | Carpet downstairs RWBproposed | $55,000 | $55,000 | ||||||||
| BLDG-028 | Air Conditioning RWBproposed | $51,000 | $51,000 | ||||||||
| BLDG-006 | Boiler THproposed | $49,500 | $49,500 | ||||||||
| BLDG-010 | Solar PS Fire share (16%)proposed | $43,100 | $43,100 | ||||||||
| BLDG-022 | Paving Etna FDproposed | $25,000 | $25,000 | ||||||||
| BLDG-007 | DC Inverter (solar) PDproposed | $20,000 | $20,000 | ||||||||
| BLDG-025 | DC Inverter (solar) THproposed | $20,000 | $20,000 | ||||||||
| BLDG-029 | Heating System FDproposed | $20,000 | $20,000 | ||||||||
| BLDG-026 | Solar Hot Water FDproposed | $15,000 | $15,000 | ||||||||
| BLDG-008 | Handicap Door Openers/Controlsproposed | $14,000 | $14,000 | ||||||||
| BLDG-014 | Waste Oil Furnaceproposed | $14,000 | $14,000 | ||||||||
| BLDG-016 | Heating System Etna FDproposed | $10,000 | $10,000 | ||||||||
| 29 projects | $246,000 | $526,873 | $360,000 | $716,554 | $628,500 | $136,000 | $2,613,927 | ||||