Window FY2028–FY2033Scenario

Emergency Generator - RWB

BLDG-018
BuildingsFleetRW BlackGeneralIn the planclassification proposed

Cost by year

$60,654 total
YearExpenditure typeBasisAmount
FY2031not statedno basis$60,654

Funding by source and year

more than one source per year is supported
SourceClassFY31Total
CRF: Building MaintenanceSaved in advance$60,654$60,654
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life25 yrs
Condition
Last purchase2006-07-07 00:00:00
Previous investment
Next investment$60,654
Trade-in value
Replacement yearFY2031
0

Classification

proposed
Importance1
Timing rationaleCondition
Project typeReplacement or maintenance

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

2005 Olympian D80P4 / 80KW, In-Service date: 4/5/2006,_x000D_ Recommended replacement: 2000hrs/25years_x000D_ Replacement cost: $57000.00 (includes transfer switch and install)

A picture is recorded in the register at S:\databases\CIP database\photos\Facilities\RW BLACK GENERATOR.jpg — upload it on the edit page to show it here.

Who pays

CRF: Building Maintenance — Property taxes, General Fund.