Solar PS Fire share (16%)
BLDG-010BuildingsBuildingsMain Fire StationFireIn the planclassification proposed
Cost by year
$43,100 total| Year | Expenditure type | Basis | Amount |
|---|---|---|---|
| FY2029 | not stated | no basis | $43,100 |
Funding by source and year
more than one source per year is supported| Source | Class | FY29 | Total |
|---|---|---|---|
| CRF: Fire Vehicle & Equipment | Saved in advance | $43,100 | $43,100 |
| Residual against cost | 0 | $0 | |
Actual spend
manual entry or CSVNothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.
Life cycle
| Useful life | 40 yrs |
| Condition | — |
| Last purchase | |
| Previous investment | — |
| Next investment | $43,100 |
| Trade-in value | — |
| Replacement year | FY2029 |
Classification
proposed| Importance | 2 |
| Timing rationale | Condition |
| Project type | Replacement or maintenance |
Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.
Movement window
Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.
Narrative
PPA buy out Fire Department share, 16% of PPA usage
Who pays
CRF: Fire Vehicle & Equipment — Property taxes, Fire Fund.