Window FY2028–FY2033Scenario

membrane roof DPW1

BLDG-001
BuildingsBuildingsDPWGeneralIn the planclassification proposed

Cost by year

$97,500 total
YearExpenditure typeBasisAmount
FY2028not statedno basis$97,500

Funding by source and year

more than one source per year is supported
SourceClassFY28Total
CRF: Building MaintenanceSaved in advance$97,500$97,500
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life15 yrs
Condition
Last purchase2013-07-01 00:00:00
Previous investment$72,500
Next investment$97,500
Trade-in value
Replacement yearFY2028

The Town paid $72,500 last time and will pay $97,500 next — 34% more.

Classification

proposed
Importance2
Timing rationaleCondition
Project typeReplacement or maintenance

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

The roof was replaced in 2010 after it was damaged by snow removal during the heavy accumulations that winter.

A picture is recorded in the register at S:\databases\CIP database\photos\Facilities\dpw membrane roof.jpg — upload it on the edit page to show it here.

Who pays

CRF: Building Maintenance — Property taxes, General Fund.