Window FY2028–FY2033Scenario

Projects

30 of 166 · $5,485,211

Every cut answers a different question, and the cuts are yours. The rail below is built from the dimensions this town keeps — add one and it appears here. Picking a parent includes everything beneath it. The charts obey the filter.

clearanalyse this selection

This selection, by year

follows the filter
$0$613k$1.2M$1.8M$2.5MFY2028 · Saved in advance · $252,000FY28FY2029 · Saved in advance · $2,452,400FY29FY2030 · Saved in advance · $1,241,461FY30FY2031 · Saved in advance · $100,000FY31FY2032 · Saved in advance · $1,061,150FY32FY2033 · Saved in advance · $378,200FY33
Saved in advance
IDProjectSet of booksDepartmentFunding sourceFY28FY29FY30FY31FY32FY33Total
WWTP-011Draw to reduce loan paymentsproposedWastewaterWater ReclamationCRF: Sewer Equipment$2,100,000$2,100,000
WWTP-012Solar Grasse Rd Phase 2 buyoutproposedWastewaterWater ReclamationCRF: Sewer Equipment$1,196,461$1,196,461
WWTP-029Digester gas holding membraneproposedWastewaterWater ReclamationCRF: Sewer Equipment$261,200$261,200
WWTP-009Sludge TrailerproposedWastewaterWater ReclamationCRF: Sewer Equipment$208,000$208,000
WWTP-015Primary digester coverproposedWastewaterWater ReclamationCRF: Sewer Equipment$175,400$175,400
WWTP-016Motor operated valvesproposedWastewaterWater ReclamationCRF: Sewer Equipment$168,100$168,100
PW-035FlusherproposedWastewaterPublic WorksCRF: Sewer Equipment$120,000$120,000
WWTP-003Skid Steer/LoaderproposedWastewaterWater ReclamationCRF: Sewer Equipment$110,000$110,000
PW-016Truck 27106proposedWastewaterPublic WorksCRF: Sewer Equipment$110,000$110,000
WWTP-014Primary PumpsproposedWastewaterWater ReclamationCRF: Sewer Equipment$100,000$100,000
WWTP-028Semi- TractorproposedWastewaterWater ReclamationCRF: Sewer Equipment$100,000$100,000
WWTP-017Flow meter local displaysproposedWastewaterWater ReclamationCRF: Sewer Equipment$87,700$87,700
WWTP-018Digester spiral heat exchangersproposedWastewaterWater ReclamationCRF: Sewer Equipment$70,200$70,200
WWTP-019Digester mixing pumpproposedWastewaterWater ReclamationCRF: Sewer Equipment$66,000$66,000
WWTP-020Centrifuge feed pumpproposedWastewaterWater ReclamationCRF: Sewer Equipment$65,800$65,800
WWTP-021Digester transfer pumpsproposedWastewaterWater ReclamationCRF: Sewer Equipment$61,400$61,400
WWTP-022Centrifuge conveyor #2proposedWastewaterWater ReclamationCRF: Sewer Equipment$61,400$61,400
WWTP-005Car - WTFproposedWastewaterWater ReclamationCRF: Sewer Equipment$60,000$60,000
WWTP-023Draft tube mixerproposedWastewaterWater ReclamationCRF: Sewer Equipment$51,200$51,200
WWTP-013Truck 05220proposedWastewaterWater ReclamationCRF: Sewer Equipment$45,000$45,000
PW-036Truck 20224proposedWastewaterPublic WorksCRF: Sewer Equipment$41,700$41,700
WWTP-024Digester recirculation pumpproposedWastewaterWater ReclamationCRF: Sewer Equipment$41,000$41,000
WWTP-004Digester 2 radar sensorproposedWastewaterWater ReclamationCRF: Sewer Equipment$36,000$36,000
WWTP-010Mixer control panelsproposedWastewaterWater ReclamationCRF: Sewer Equipment$34,400$34,400
WWTP-025Centrifuge conveyor #1proposedWastewaterWater ReclamationCRF: Sewer Equipment$29,250$29,250
WWTP-026Hazardous gas alarm panelproposedWastewaterWater ReclamationCRF: Sewer Equipment$22,000$22,000
WWTP-006Digester 2 gas pressure sensorproposedWastewaterWater ReclamationCRF: Sewer Equipment$18,000$18,000
WWTP-007Digester 2 membrane cover air systemproposedWastewaterWater ReclamationCRF: Sewer Equipment$18,000$18,000
PW-040Air Compressor LMCproposedWastewaterPublic WorksCRF: Sewer Equipment$17,000$17,000
WWTP-008Hazardous gas detection sensorproposedWastewaterWater ReclamationCRF: Sewer Equipment$10,000$10,000
30 projects$252,000$2,452,400$1,241,461$100,000$1,061,150$378,200$5,485,211