Window FY2028–FY2033Scenario

Skid Steer/Loader

WWTP-003
Water ReclamationWater ReclamationRolling StockWastewaterIn the planclassification proposed

Cost by year

$110,000 total
YearExpenditure typeBasisAmount
FY2028not statedno basis$110,000

Funding by source and year

more than one source per year is supported
SourceClassFY28Total
CRF: Sewer EquipmentSaved in advance$110,000$110,000
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life21 yrs
Condition
Last purchase2007-07-01 00:00:00
Previous investment$20,200
Next investment$110,000
Trade-in value$7,251
Replacement yearFY2028

The Town paid $20,200 last time and will pay $110,000 next — 445% more.

Classification

proposed
Importance2
Timing rationaleDelivery and operations
Project typeReplacement or maintenance

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

This piece of equipment is used by the WRF Division to move materials at the Water Reclamation Facility and pump stations. In addition, it is used to move the sludge trailer as it is filled.

A picture is recorded in the register at S:\databases\CIP database\photos\WRF\Skidsteer.jpg — upload it on the edit page to show it here.

Who pays

CRF: Sewer Equipment — Sewer user fees, Sewer Fund.