Window FY2028–FY2033Scenario

Car - WTF

WWTP-005
Water ReclamationWater ReclamationRolling StockWastewaterIn the planclassification proposed

Cost by year

$60,000 total
YearExpenditure typeBasisAmount
FY2028not statedno basis$60,000

Funding by source and year

more than one source per year is supported
SourceClassFY28Total
CRF: Sewer EquipmentSaved in advance$60,000$60,000
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life10 yrs
Condition
Last purchase2018-07-01 00:00:00
Previous investment$17,600
Next investment$60,000
Trade-in value$6,137
Replacement yearFY2028

The Town paid $17,600 last time and will pay $60,000 next — 241% more.

Classification

proposed
Importance2
Timing rationaleCondition
Project typeReplacement or maintenance

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

This vehicle is used by WRF personnel to travel to sites, meetings, training, and sampling locations. When replaced will we replaced with plug in EV

A picture is recorded in the register at S:\databases\CIP database\photos\Vehicles\WRFCAR.jpg — upload it on the edit page to show it here.

Who pays

CRF: Sewer Equipment — Sewer user fees, Sewer Fund.