Window FY2028–FY2033Scenario

Mixer control panels

WWTP-010
Water ReclamationWater ReclamationWRFWastewaterIn the planclassification proposed

Cost by year

$34,400 total
YearExpenditure typeBasisAmount
FY2029not statedno basis$34,400

Funding by source and year

more than one source per year is supported
SourceClassFY29Total
CRF: Sewer EquipmentSaved in advance$34,400$34,400
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life25 yrs
Condition
Last purchase2004-07-01 00:00:00
Previous investment$25,000
Next investment$34,400
Trade-in value
Replacement yearFY2029

The Town paid $25,000 last time and will pay $34,400 next — 38% more.

Classification

proposed
Importance2
Timing rationaleCondition
Project typeReplacement or maintenance

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

Typical of 10 units installed in 2004.

A picture is recorded in the register at S:\databases\CIP database\photos\WRF\anoxic mixer control.JPG — upload it on the edit page to show it here.

Who pays

CRF: Sewer Equipment — Sewer user fees, Sewer Fund.