Reference data
the inputs everything else depends onscenario: fit inside 1mTwo of these have been open since August: no schedule of existing outstanding debt, and no assessed valuation. Together they are what converts the plan into a tax rate.
Reference data is administrator-only. Sign in.
No outstanding debt has been entered.Until it is, every debt-service total in the product is an addition to a figure that is not shown, and understates by exactly that amount. Bow and Windham both publish theirs.
Debt instruments
19 total · 0 outstanding| Name | Status | Fund | Principal | Issued | Rate | Term | |
|---|---|---|---|---|---|---|---|
| South Main Street Reconstruction | planned | Bond: General Fund | $15,000,000 | FY2028 | default | default | |
| Pump Station #4 | planned | Bond: Wastewater | $1,400,000 | FY2028 | default | default | |
| bridge112/091 | planned | Bond: Bridge | $217,000 | FY2034 | default | default | |
| bridge131/162 | planned | Bond: Bridge | $201,800 | FY2034 | default | default | |
| bridge133/089 | planned | Bond: Bridge | $182,300 | FY2034 | default | default | |
| bridge115/078 | planned | Bond: Bridge | $125,000 | FY2034 | default | default | |
| bridge107/063 | planned | Bond: Bridge | $91,150 | FY2034 | default | default | |
| bridge110/069 | planned | Bond: Bridge | $90,000 | FY2034 | default | default | |
| bridge108/066 | planned | Bond: Bridge | $89,300 | FY2034 | default | default | |
| Ledyard Bridge Lighting | planned | Bond: Bridge | $36,000 | FY2037 | default | default | |
| Tower 1 | planned | Bond: Fire | $1,150,000 | FY2036 | default | default | |
| Engine 2 | planned | Bond: Fire | $1,300,000 | FY2035 | default | default | |
| Fuel Island & TanksStorage | planned | Bond: General Fund | $1,680,000 | FY2036 | default | default | |
| Dewatering centrifuges | planned | Bond: Wastewater | $794,000 | FY2035 | default | default | |
| Pump Station #5 | planned | Bond: Wastewater | $742,000 | FY2037 | default | default | |
| Distribution Project 2 ($455k) | planned | Bond: Water | $8,100,000 | FY2029 | default | default | |
| Shed # 2 relocation to DPW | planned | Bond: General Fund | $500,000 | FY2032 | default | default | |
| Fire Radio System | planned | Bond: Fire | $645,000 | FY2033 | default | default | |
| Facilty upgrade phase 2 | planned | Bond: Wastewater | $20,000,000 | FY2033 | default | default |