Window FY2028–FY2033Scenario

Reference data

the inputs everything else depends on

Two of these have been open since August: no schedule of existing outstanding debt, and no assessed valuation. Together they are what converts the plan into a tax rate.

Reference data is administrator-only. Sign in.

Existing debtValuationFundsPrioritiesAssumptions

No outstanding debt has been entered.Until it is, every debt-service total in the product is an addition to a figure that is not shown, and understates by exactly that amount. Bow and Windham both publish theirs.

Debt instruments

19 total · 0 outstanding
NameStatusFundPrincipalIssuedRateTerm
South Main Street ReconstructionplannedBond: General Fund$15,000,000FY2028defaultdefault
Pump Station #4plannedBond: Wastewater$1,400,000FY2028defaultdefault
bridge112/091plannedBond: Bridge$217,000FY2034defaultdefault
bridge131/162plannedBond: Bridge$201,800FY2034defaultdefault
bridge133/089plannedBond: Bridge$182,300FY2034defaultdefault
bridge115/078plannedBond: Bridge$125,000FY2034defaultdefault
bridge107/063plannedBond: Bridge$91,150FY2034defaultdefault
bridge110/069plannedBond: Bridge$90,000FY2034defaultdefault
bridge108/066plannedBond: Bridge$89,300FY2034defaultdefault
Ledyard Bridge LightingplannedBond: Bridge$36,000FY2037defaultdefault
Tower 1plannedBond: Fire$1,150,000FY2036defaultdefault
Engine 2plannedBond: Fire$1,300,000FY2035defaultdefault
Fuel Island & TanksStorageplannedBond: General Fund$1,680,000FY2036defaultdefault
Dewatering centrifugesplannedBond: Wastewater$794,000FY2035defaultdefault
Pump Station #5plannedBond: Wastewater$742,000FY2037defaultdefault
Distribution Project 2 ($455k)plannedBond: Water$8,100,000FY2029defaultdefault
Shed # 2 relocation to DPWplannedBond: General Fund$500,000FY2032defaultdefault
Fire Radio SystemplannedBond: Fire$645,000FY2033defaultdefault
Facilty upgrade phase 2plannedBond: Wastewater$20,000,000FY2033defaultdefault

Add an instrument

outstanding debt, an authorised issue, or a planned one