WRF Roof

R-CIP-0221
Water_ReclamationWater_ReclamationWRFWastewaterIn the planclassification derived

Cost by year

$295,000 total
YearExpenditure typeBasisAmount
FY2035not statedno basis$295,000

Funding by source and year

more than one source per year is supported
SourceClassFY35Total
CRF: Sewer EquipmentSaved in advance$295,000$295,000
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life20 yrs
Condition
Last purchase2015-07-01 00:00:00
Previous investment$157,000
Next investment$295,000
Trade-in value
Replacement yearFY2035

The Town paid $157,000 last time and will pay $295,000 next — 88% more.

Classification

derived
Importance
Timing rationale
Project type

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

Membrane roof installed in 1989 has numerous leaks due to penetrations and equipment. Replaced in 2015. at next replacement solar will need to be removed and reinstalled.

A picture is recorded in the register at S:\databases\CIP database\photos\WRF\roof.jpg — upload it on the edit page to show it here.

Who pays

CRF: Sewer Equipment — Sewer user fees, Sewer Fund.