Window FY2028–FY2033Scenario

Lebanon/Park Signal Head Replacement Coop signals

R-CIP-0211
Public WorksHighwayCoop intersectionGeneralIn the planclassification derived

Cost by year

$15,500 total
YearExpenditure typeBasisAmount
FY2044not statedno basis$15,500

Funding by source and year

more than one source per year is supported
SourceClassFY44Total
CRF: Road ConstructionSaved in advance$15,500$15,500
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life25 yrs
Condition
Last purchase2019-07-08 00:00:00
Previous investment
Next investment$15,500
Trade-in value
Replacement yearFY2044
0

Classification

derived
Importance
Timing rationale
Project type

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

Replaces the corroded signal heads installed in 1985 which consists of 10 light units.

A picture is recorded in the register at S:\databases\CIP database\photos\Road Construction\coop signal heads.PNG — upload it on the edit page to show it here.

Who pays

CRF: Road Construction — Property taxes, General Fund.