Window FY2028–FY2033Scenario

Main/South/Maple Gridsmart Video Detection System

R-CIP-0208
Public WorksHighwayMain/South/MapleGeneralIn the planclassification derived

Cost by year

$25,000 total
YearExpenditure typeBasisAmount
FY2041not statedno basis$25,000

Funding by source and year

more than one source per year is supported
SourceClassFY41Total
CRF: Road ConstructionSaved in advance$25,000$25,000
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life20 yrs
Condition
Last purchase2021-07-06 00:00:00
Previous investment$25,000
Next investment$25,000
Trade-in value
Replacement yearFY2041

The Town paid $25,000 last time and will pay $25,000 next — 0% more.

Classification

derived
Importance
Timing rationale
Project type

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

System includes Gridsmart video detection system w/ vehicle counting & data logging

A picture is recorded in the register at S:\databases\CIP database\photos\Traffic signals & lights\Gridsmart video detection system.PNG — upload it on the edit page to show it here.

Who pays

CRF: Road Construction — Property taxes, General Fund.