Window FY2028–FY2033Scenario

Summer/Park Mast Arms

R-CIP-0201
Public WorksHighwaySummer/ParkGeneralIn the planclassification derived

Cost by year

$36,000 total
YearExpenditure typeBasisAmount
FY2039not statedno basis$36,000

Funding by source and year

more than one source per year is supported
SourceClassFY39Total
CRF: Road ConstructionSaved in advance$36,000$36,000
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life25 yrs
Condition
Last purchase2014-07-07 00:00:00
Previous investment
Next investment$36,000
Trade-in value
Replacement yearFY2039
0

Classification

derived
Importance
Timing rationale
Project type

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

Mast Arms hold traffic signals, galvanized steel painted black

A picture is recorded in the register at S:\Databases\CIP database\photos\hanover_logo.jpg — upload it on the edit page to show it here.

Who pays

CRF: Road Construction — Property taxes, General Fund.