Window FY2028–FY2033Scenario

Summer/Park Control Cabinet

R-CIP-0194
Public WorksHighwaySummer/ParkGeneralIn the planclassification derived

Cost by year

$61,000 total
YearExpenditure typeBasisAmount
FY2034not statedno basis$61,000

Funding by source and year

more than one source per year is supported
SourceClassFY34Total
CRF: Road ConstructionSaved in advance$61,000$61,000
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life20 yrs
Condition
Last purchase2014-07-06 00:00:00
Previous investment
Next investment$61,000
Trade-in value
Replacement yearFY2034
0

Classification

derived
Importance
Timing rationale
Project type

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

Control Cabinet includes Aluminum P-44McCain ATC ground mounted cabinet, Police door w/ manual cord, Auto/Manual, Flash/Auto & signal On/Off switches. McClain ATC controller w/ Omni software, 16 channel Reno MMU2-1600GE, full complement of load switches & flash relays, 4 Channel preemption Card, Gridsmart Video Processer, Switched cabinet lamps, GFI duplex receptacle, thermostatically controlled fan, generator switch and plug, 2 sets of box prints & 1 set of equipment manuals

A picture is recorded in the register at S:\Databases\CIP database\photos\hanover_logo.jpg — upload it on the edit page to show it here.

Who pays

CRF: Road Construction — Property taxes, General Fund.