Sidewalk Tanzi to Greensboro
R-CIP-0157Cost by year
$40,500 total| Year | Expenditure type | Basis | Amount |
|---|---|---|---|
| FY2043 | not stated | no basis | $40,500 |
Funding by source and year
more than one source per year is supported| Source | Class | FY43 | Total |
|---|---|---|---|
| CRF: Municipal Transportation | Saved in advance | $40,500 | $40,500 |
| Residual against cost | 0 | $0 | |
Actual spend
manual entry or CSVNothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.
Life cycle
| Useful life | 25 yrs |
| Condition | — |
| Last purchase | — |
| Previous investment | $40,500 |
| Next investment | $40,500 |
| Trade-in value | — |
| Replacement year | FY2043 |
The Town paid $40,500 last time and will pay $40,500 next — 0% more.
Classification
derived| Importance | — |
| Timing rationale | — |
| Project type | — |
Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.
Movement window
Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.
Narrative
This will complete the sidewalk from the Tanzi access to Greensboro Road and signal changes for pedestrian crossing. An application was made to the NHDOT Transportation Alternatives Program in 2014 but the project was not funded (scored 23 out of 42 projects) due to limited funding. The project will be done at the same time the road overlay to provide the bulk of the funding through the paving program. The overall project cost was $135,315 but only represents the added cost of the project over the cost of paving the road at its current width.
A picture is recorded in the register at S:\databases\CIP database\photos\Municipal transportation\MUP_LebSt_Tansy2Grns_Map.JPG — upload it on the edit page to show it here.
Who pays
CRF: Municipal Transportation — Dedicated fee, General Fund.