Window FY2028–FY2033Scenario

120 MUP Buck to DHMC

PW-029
Public WorksHighwayRoute 120GeneralIn the planclassification proposed

Cost by year

$200,000 total
YearExpenditure typeBasisAmount
FY2031not statedno basis$200,000

Funding by source and year

more than one source per year is supported
SourceClassFY31Total
CRF: Municipal TransportationSaved in advance$200,000$200,000
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life25 yrs
Condition
Last purchase
Previous investment$200,000
Next investment$200,000
Trade-in value
Replacement yearFY2031

The Town paid $200,000 last time and will pay $200,000 next — 0% more.

Classification

proposed
Importance2
Timing rationaleCondition
Project typeReplacement or maintenance

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

MUP on West side of 120 off road. Project envisions an off road path, guard rail, fill and a connection to the existing sidewalk. Will require more winter maintenance, possibly of DHMC path.

A picture is recorded in the register at C:\Users\peterk\OneDrive - Town of Hanover\Databases\CIP database\photos\Municipal transportation\MUP_Buck2MedCtrDr_Map.JPG — upload it on the edit page to show it here.

Who pays

CRF: Municipal Transportation — Dedicated fee, General Fund.