Window FY2028–FY2033Scenario

Lebanon/Park Signal Mast Arms

PW-008
Public WorksHighwayLebanon/ParkGeneralIn the planclassification proposed

Cost by year

$25,000 total
YearExpenditure typeBasisAmount
FY2028not statedno basis$25,000

Funding by source and year

more than one source per year is supported
SourceClassFY28Total
CRF: Road ConstructionSaved in advance$25,000$25,000
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life25 yrs
Condition
Last purchase2003-07-08 00:00:00
Previous investment
Next investment$25,000
Trade-in value
Replacement yearFY2028
0

Classification

proposed
Importance2
Timing rationaleCondition
Project typeReplacement or maintenance

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Narrative

Mast Arms hold traffic signals, galvanized steel painted black

A picture is recorded in the register at S:\databases\CIP database\photos\Traffic signals & lights\mast arms.PNG — upload it on the edit page to show it here.

Who pays

CRF: Road Construction — Property taxes, General Fund.