South Main Street Reconstruction
PW-001Public WorksHighwaySouth Main StreetGeneralIn the planclassification proposed
Cost by year
$15,000,000 total| Year | Expenditure type | Basis | Amount |
|---|---|---|---|
| FY2028 | not stated | no basis | $15,000,000 |
Funding by source and year
more than one source per year is supported| Source | Class | FY28 | Total |
|---|---|---|---|
| Bond: General Fund | Borrowed | $15,000,000 | $15,000,000 |
| Residual against cost | 0 | $0 | |
Actual spend
manual entry or CSVNothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.
Life cycle
| Useful life | 50 yrs |
| Condition | — |
| Last purchase | |
| Previous investment | — |
| Next investment | $15,000,000 |
| Trade-in value | — |
| Replacement year | FY2028 |
Classification
proposed| Importance | 2 |
| Timing rationale | Delivery and operations |
| Project type | Replacement or maintenance |
Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.
Movement window
Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.
Who pays
Bond: General Fund — Property taxes, General Fund.