Window FY2028–FY2033Scenario

SCBA/ N95 fit tester

FIRE-013
FireNot statedEtna LibraryFireIn the planclassification proposed

Cost by year

$24,500 total
YearExpenditure typeBasisAmount
FY2033not statedno basis$24,500

Funding by source and year

more than one source per year is supported
SourceClassFY33Total
GrantOutside money$24,500$24,500
Residual against cost0$0

Actual spend

manual entry or CSV

Nothing recorded. Actuals sit at the same grain as the funding above — by year and by source — so plan against actual works at the level the money was planned at.

Life cycle

Useful life10 yrs
Condition
Last purchase
Previous investment
Next investment$24,500
Trade-in value
Replacement yearFY2033
0

Classification

proposed
Importance1
Timing rationaleCondition
Project typeNew or expansion

Proposed by rule. Nobody has confirmed it, so nothing built on these values states a fact.

Movement window

Not set. How far this project can move does not exist in the register, and the scenario engine cannot move anything without it. This is a question for the department, not a default.

Who pays

Grant — Outside the Town, Not stated.