Window FY2028–FY2033Scenario

Dimensions

11 dimensions · 178 values

The cuts are yours. Add a dimension and it appears on the projects rail and the analysis page without anybody writing code. Some carry a role — the model reads those, so they can be renamed but not removed.

Instrument

funding sources · one value · 28 tagged

How the cash arrives. Decides which arithmetic runs — amortisation, a balance roll-forward, or none.

The model reads this one. Decides which arithmetic runs: amortisation, a balance roll-forward, or none. Rename it, add values, group them — all fine. It cannot be deleted, and no value may carry a meaning the engine does not know.

Values

a total at a parent includes everything beneath it
ValueSits beneathMeansRows using it
Saved in advanceSaved up in advance12
BorrowedBorrowed and repaid5
Annual budgetRaised in the year it is spent5
Fund balanceTaken from surplus1
Outside moneyComes from outside the Town3
No source identifiedNo arithmetic at all0 + 2 below
└ Not statedNo source identifiedNo arithmetic at all1
└ UnfundedNo source identifiedNo arithmetic at all1

Nothing is deleted in a hurry. A value in use is retired — it leaves the pickers and every existing tag survives. When two values are the same thing, merge them: every row is retagged and the old name is kept as an alias. Every one of these writes a row to Activity.